Saturday, 21 Nov 09
stage construction continue again with the work for the postponed work yesterday.
today, all the needed material is provided by the technician except the plastic composite or some called as 'prospect' material for the middle part of the stage. work is very hard today but the technician help us a lot in designing and building the stage as fast as possible.
the machines used in this work are MitreSaw and JigSaw.
these are the section parts from three section that is A,B and C that we have to build for the stage to complete.
the two sections that are A and C is almost complete except the last section that is section B is hold to wait for the material being ordered.
stage construction continue again with the work for the postponed work yesterday.
today, all the needed material is provided by the technician except the plastic composite or some called as 'prospect' material for the middle part of the stage. work is very hard today but the technician help us a lot in designing and building the stage as fast as possible.
the machines used in this work are MitreSaw and JigSaw.
these are the section parts from three section that is A,B and C that we have to build for the stage to complete.
the two sections that are A and C is almost complete except the last section that is section B is hold to wait for the material being ordered.